P’4 |
Second series
of 1300 MWe nuclear reactors (EDF) |
RADWASS |
Radioactive Waste Safety
Standards (IAEA) |
RAMG |
Regulatory Assistance Management
Group (group set up by the European Commission to advise it on technical
assistance requests from the nuclear regulators of Eastern European
states) |
RAPSODIE |
Former fast neutron experimental
reactor (CEA - Cadarache) |
RASSC |
Radiation Safety
Standards Committee (IAEA) |
RaSSIA |
Radiation Safety and Security
Infrastructure Appraisal (IAEA) |
RBE |
Relative Biological Effectiveness |
RCC |
Design and construction
rules |
RCC-E
|
RCC for electrical equipment |
RCC-G
|
RCC for civil engineering |
RCC-M
|
RCC for mechanical equipment |
RCD |
Waste recovery and packaging |
RCV |
Chemical and volume control
system (PWR) |
PWR |
Pressurised Water Reactor |
RESERVOIR |
Aqueous radiaoctive effluent
storage installation (CEA - Saclay) |
REX |
Experiencefeedback |
RFS |
Basic safety rule |
RGE |
General operating rules |
RHF |
High flux reactor (Institut
Laue-Langevin - Grenoble) |
RIA |
Radio Immunology Assay |
RIC |
In-core instrumentation
system (PWR) - Regulatory Information Conference (annual public conference
by the United States Nuclear Safety Authority) |
RID |
Regulations concerning
the International Carriage of Dangerous Goods by Rail |
RIS |
Safety injection circuit
(PWR) |
RIVM |
Dutch National Institute
for Public Health and the Environment |
RJH |
Jules Horowitz reactor
(irradiation reactor project: CEA - Cadarache) |
RM2 |
Former radiometallurgy
laboratory No. 2 (CEA - Fontenay-aux-Roses) |
RNA |
Ribonucleic acid |
ROTONDE
(la) |
Solid waste management
installation project (CEA - Cadarache) |
RPII |
Radiological Protection
Institute of Ireland |
RHRS |
Residual heat removal system
(PWR) |